Features of Bougainville Copper LimitedÆs Concentration Water Supply System

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
334 KB
Publication Date:
Jan 1, 1978

Abstract

The problems of the as-built water supply system are discussed. Recent modifications to the collection dams and the water cleaning station using wedge wire screens to resolve these problems are outlined.
Citation

APA:  (1978)  Features of Bougainville Copper LimitedÆs Concentration Water Supply System

MLA: Features of Bougainville Copper LimitedÆs Concentration Water Supply System. The Australasian Institute of Mining and Metallurgy, 1978.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account