Tunnel excavation while mining is not often performed in North America primarily due to access constraints in both operations. Referencing European approaches for long distance tunneling, the Devil?s Slide Tunnel project has applied innovation and technology to provide the ability to overcome this unique challenge. The Devil?s Slide Tunnel requires the construction of twin bore tunnels excavated based on sequential excavation method (SEM) construction methods using New Austrian Tunneling Methods (NATM) principles. The twin tunnels are approximately 9 m (30 ft) in diameter and 1,250 m (4,100 linear ft) in length. The purpose of this project is to reroute Route 1 from around the Devil?s Slide through the San Pedro Mountains crossing from Montara, CA along the south and into Pacifica, CA in the north. The Caltrans project was awarded in December 2006 for a total of $272,366,000. The job is an A+B job, thus the estimate scheme of final lining while tunnel excavation is important to save time. A+B is a method of rewarding a contractor for completing a project as quickly as possible. By providing a cost each working day, the contract combines the cost to perform the work (A) with the cost of impact to the public (B) to provide the lowest cost to the public. Concurrent mining while lining is achieved through a series of gantries and a set of tunnel forms allowing the pass-through of the excavation equipment. The tunnel lining operation passes through several phases of work that are dependent upon the progress of the tunnel excavation process. This involves unique milestones, such as the evolution of the ventilation system, development of an enlarged cross passage to allow equipment to access each tunnel from within the tunnel and, finally, the installation of an invert prior to arch lining that limits the continuity of the final lining operation.
Citation

APA: Stephen Liu  (2011)  Final Lining At Devil?s Slide Tunnel

MLA: Stephen Liu Final Lining At Devil?s Slide Tunnel. Society for Mining, Metallurgy & Exploration, 2011.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account