The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approach in placing the liner in areas of tunnel that experienced crown overbreak. Tunnel lining production rates, installation procedures and form buoyancies experienced during concrete placement will also be presented.