Final Tunnel Linings on Oakwood Beach West Branch Interceptor, Staten Island, New York

Society for Mining, Metallurgy & Exploration
Peter S. Schneidkraut
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
463 KB
Publication Date:
Jan 1, 1993

Abstract

This paper will discuss the Final Tunnel Linings which were placed in 6700m of a 2.32m inside diameter precast concrete lined interceptor sewer tunnel in Staten Island, New York. Two methods were employed to install the final tunnel linings. One method involved forming and placing a polypropylene fiber reinforced concrete cunnette invert, followed by an arch pour. The second method involved the jacking of reinforced concrete pipe into the tunnel, followed by a low density cellular concrete backfill grout. These two methods will be described and compared.
Citation

APA: Peter S. Schneidkraut  (1993)  Final Tunnel Linings on Oakwood Beach West Branch Interceptor, Staten Island, New York

MLA: Peter S. Schneidkraut Final Tunnel Linings on Oakwood Beach West Branch Interceptor, Staten Island, New York. Society for Mining, Metallurgy & Exploration, 1993.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account