Floor Bolting For Control Of Mine Floor Heave (fc60805a-0d80-4a84-b600-b1023fffe3cf)

Society for Mining, Metallurgy & Exploration
J. C. Stankus
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
528 KB
Publication Date:
Jan 1, 1993

Abstract

Many coal seams are associated with soft floor strata and during mine development if coal pillars are not properly designed, floor heave occurs and causes interruption of coal production. In the severe cases, the section or mine is abandoned. One of the methods for controlling floor heave is floor bolting. This paper describes the demonstration of floor bolting methods in a West Virginia coal mine. Three methods were used: (1) vertical full resin bolting, (2) floor truss bolting, and (3) floor truss bolting plus a floor cut at the center of the entry. The design of each method and the experimental results are discussed in detail.
Citation

APA: J. C. Stankus  (1993)  Floor Bolting For Control Of Mine Floor Heave (fc60805a-0d80-4a84-b600-b1023fffe3cf)

MLA: J. C. Stankus Floor Bolting For Control Of Mine Floor Heave (fc60805a-0d80-4a84-b600-b1023fffe3cf). Society for Mining, Metallurgy & Exploration, 1993.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account