Fraser Mine Material Handling System

Canadian Institute of Mining, Metallurgy and Petroleum
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
34
File Size:
908 KB
Publication Date:
Feb 1, 2008

Abstract

Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are best option for Fraser Morgan (>20M + schedule for other). - Peak will have to be managed. - Critical to have equipment & infrastructure in best possible condition to ensure reliability.
Citation

APA:  (2008)  Fraser Mine Material Handling System

MLA: Fraser Mine Material Handling System. Canadian Institute of Mining, Metallurgy and Petroleum, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account