Fraser Mine Material Handling System

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 34
- File Size:
- 908 KB
- Publication Date:
- Feb 1, 2008
Abstract
Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are best option for Fraser Morgan (>20M + schedule for other). - Peak will have to be managed. - Critical to have equipment & infrastructure in best possible condition to ensure reliability.
Citation
APA: (2008) Fraser Mine Material Handling System
MLA: Fraser Mine Material Handling System. Canadian Institute of Mining, Metallurgy and Petroleum, 2008.