Abstract

Two three-lane highway tunnels, 700 and 2900 m long, make up the driven tunnels portion of Melbourne City Link. Tunnel construction, using design-construct delivery, commenced in May 1996. Construction required excavation through varying rock conditions; temporary support included ground freezing, pipe-spiling, steel sets, and rock bolts. Permanent support for the tunnels required both drained and undrained tunnel cross sections using unreinforced concrete. This paper reviews the construction methods, and highlights some of the not-so-standard designs developed while construction was underway.
Citation

APA: Daniel N. Adams Bruce Hutchison Clive Wilson  (1999)  Freezing to Tanking: Challenges of the City Link Driven Tunnels

MLA: Daniel N. Adams Bruce Hutchison Clive Wilson Freezing to Tanking: Challenges of the City Link Driven Tunnels. Society for Mining, Metallurgy & Exploration, 1999.