Geotechnical Considerations No. 7 Subway Line Extension Project in New York City

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 16
- File Size:
- 5456 KB
- Publication Date:
- Jan 1, 2005
Abstract
As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending from the Times Square Station west beneath 41stStreet turning south under Eleventh Avenue and terminating at 25th Street will include two new stations. The tunnels and station caverns will be primarily constructed in the Manhattan Schist, and will pass in close proximity to several major overly ingstructures. This paper discusses the lithology and structural discontinuities of rockmass along the project alignment, tunnel and cavern rock loading, groundwater hydrology, groundwater quality, groundwater treatment and sustainable design.
Citation
APA:
(2005) Geotechnical Considerations No. 7 Subway Line Extension Project in New York CityMLA: Geotechnical Considerations No. 7 Subway Line Extension Project in New York City. Society for Mining, Metallurgy & Exploration, 2005.