Geotechnical Milestones at Mount Lyell Mine

The Australasian Institute of Mining and Metallurgy
G B. Sharrock D A. Cuello
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
11
File Size:
1778 KB
Publication Date:
May 9, 2016

Abstract

The Prince Lyell orebody at Mount Lyell Mine has a rich mining history commencing with the open pit in 1935, which transitioned underground in 1972. Between 1972 and 2014 a total of 64 Mt was mined underground as the mine extended from 210 m to 1100 m below surface. As the depth increased, three separate transitions in the mining method occurred to meet the changing geotechnical conditions, ore grade, mining costs and metal prices. The first was open stoping with pillar recovery in 1972, followed by front caving and longitudinal sublevel caving (1995), and finally transverse sublevel caving (2004 to 2014). This paper provides an overview of key geotechnical and planning milestones relating to the evolution of the mining method including underground stability, gravity flow, cavability and subsidence. Key aspects of the mine design, geotechnical parameters and rock mass response are described and critiqued with reference to observational, numerical and empirical methods.CITATION:Sharrock, G B and Cuello, D A, 2016. Geotechnical milestones at Mount Lyell Mine, in Proceedings Seventh International Conference and Exhibition on Mass Mining (MassMin 2016), pp 427–438 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation

APA: G B. Sharrock D A. Cuello  (2016)  Geotechnical Milestones at Mount Lyell Mine

MLA: G B. Sharrock D A. Cuello Geotechnical Milestones at Mount Lyell Mine. The Australasian Institute of Mining and Metallurgy, 2016.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account