Going Hard at Soft Ground in Buenos Aires

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 17
- File Size:
- 2811 KB
- Publication Date:
- Jan 1, 1999
Abstract
A 15 km water supply tunnel is being constructed in Buenos Aires, Argentinata expand the capacity of the existing system. Two 4.3 meter diameter Earth Pressure Balance (EPB) tunneling machines operating at times from the same shaft on a congested work site and advancing through sedimentary deposits underlying this wonderful city pose interesting challenges. As of January 1999approximately 50% of the tunnel has been excavated. Combined machine production rates of 1026 m/month have been achieved. Presentations made in prior proceedings can be referenced for details of the overall Project scope and for details of the tendering process. The purpose of this paper is to compliment those presentations by addressing now the execution of the work.
Citation
APA:
(1999) Going Hard at Soft Ground in Buenos AiresMLA: Going Hard at Soft Ground in Buenos Aires. Society for Mining, Metallurgy & Exploration, 1999.