Abstract
The Ortiz Mountain property is located approximately 40 km (25 miles) southeast of Santa Fe and 13 km (8 miles) from the village of Cerrillos. The property embodies a Spanish mineral grant from which Gold Fields acquired about 2, 200 hectares (900 acres of surface and mineral rights. Following a period of exploration, metallurgical testing and development of a feasibility study in 1974, the decision was made, because of the higher gold price in the fall of 1978, to place the property into production. the gold is confined in a quartzite breccia; it is an unusual occurrence because the gold in this host rock is leachable at minus 19 mm (3/4 in. ). Total ore reserves are estimated at approximately 3.6 million mt (4 million st) averaging 1.89 g per mt (0.055 oz per st) based on a cut-off of 0.7 g (0.02 oz). The ore will be recovered by open pit mining at a stripping ratio of 1. 2:l. Production is scheduled for 13,600 mt (15,000 st) of ore per week or approximately 680,000 mt (750,000 st) per year. Primary crushing of pit-run material is by a 1,070 by 1,015 mm (42 in. by 40 in.) jaw crusher. Crushed ore is conveyed to stockpile and then to a 2.13 m (7 ft) standard crusher with the screened over- size crushed in a 1.5 m (5 ft) tertiary cone crusher. The screen undersize, the final product for leaching, is minus 19 mm (3/4 in. ). A 1, 360 kg (3,000 lb) sample is cut from the crushed ore stream, further crushed in a small jaw crusher and then sampled in two more stages by Vezin samplers to produce a final 13.6 kg (30 lb) sample for assaying. Pebble lime is then added to the ore on the belt as it is sent to the conveyor gantry spanning the leach pads. A tripper on this moving gantry stacks the leach ore without compaction. The entire crushing plant and conveying system is of open-air construction. Leach pads have a total length of 515 m by 60 m (1,700 ft by 200 ft) wide with usable dimensions of 490 m by 58 m (1,600 ft by 190 ft). The directional length slope is 3. 870 with 370 on the width. The pad is constructed of 175 mm (7 in. ) thick asphalt containing a rubberized asphalt membrane. It is divided by a 300 mm (1 ft) high curb into eight segments. Each segment is loaded with 13,600 mt (15,000 st) of ore, which is one week's production. Optimum working height of a pad is considered to be 3. 0 m (10 ft) with a maximum height of 4. 0 m (14 ft).
Citation
APA: (1981) Gold Fields Mining Corporation - Ortiz Mine - New Mexico
MLA: Gold Fields Mining Corporation - Ortiz Mine - New Mexico. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1981.