Gold Mill Expansion at Kambalda

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
304 KB
Publication Date:
Jan 1, 1984

Abstract

The design, construction and operation of a 500,000 tonne per year Carbon-In-Pulp (C.I.P.) plant at Kambalda embracing the period from 1980 to 1982 has been previously discussed (Sceresini, 1982).Since that time the annual throughput rate has increased to 780,000 tpy.This paper discusses the changes and improve-ment made to allow this increased production to occur with minimal capital expenditure.