Goldcorp Eleonore - The First Year of Mill Operation

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 10
- File Size:
- 4233 KB
- Publication Date:
- Jan 1, 2016
Abstract
"Goldcorp – Eleonore’s 7 000 tonnes per day gold mill was started up in October 2014 and achieved commercial production in April 2015. During the first year, operation has faced challenges from grinding, flotation, sulfide cyanidation and tailing filtration to achieve targeted throughput, availability and recovery.The optimization of non-sulfide tails filter cloth lifetime and filter press availability had the most significant impact on ramp-up of both mill throughput and availability. A change in steel ball addition size to the grinding circuit was made to meet the targeted p80 of 65 µm. Various optimization efforts were conducted on the flotation circuit, intended to recover all sulfide-bearing minerals. The goal is to attain the environmental target of 0.12% sulfur in flotation tails (to eliminate acid mine drainage or AMD), while an average of 0.31% sulfur was obtained over the first months of 2015. Collectors, frothers, activators and hydrodynamic parameters were tested to improve the circuit desulfurization efficiency. High sulfide reactivity in pre-oxidation and cyanidation severely impacted dissolved oxygen levels and cyanide consumption. Studies were undertaken to understand the effects of mineralogy, grind size and leach conditions on gold dissolution kinetics and cyanide consumption. Efforts were focused on pre-oxidation to restore dissolved oxygen levels as well as optimizing both lead nitrate addition and pre-oxidation time.INTRODUCTIONGoldcorp Eleonore’s mill commissioning started in September 2014. It was considered to operate the mill at 3 500 tpd during design, as the mine was planning to operate at this throughput for the first year. However, with the stockpile of ore and a higher throughput from the mine, the mill was able to run at higher tonnage than initially anticipated.While increasing tonnage, a few bottlenecks were discovered and overcome in areas such as filtration and cyanide destruction. There were also recovery issues which were addressed in areas such as grind and sulfide leach. This paper focusses on the first complete year of operation ending September 30th 2015. A process description and the flowsheet are presented below and it will then go into detail about operational, metallurgical, mechanical and design issues experienced during the year."
Citation
APA:
(2016) Goldcorp Eleonore - The First Year of Mill OperationMLA: Goldcorp Eleonore - The First Year of Mill Operation. Canadian Institute of Mining, Metallurgy and Petroleum, 2016.