Abstract
"INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is located in the Marathon area of north - western Ontario, immediately north of Highway 17 and about- 3.5 km west of Highway 614.With the exception of selected unit processes, the mill was designed for a nominal throughput of 2500 tonnes per day with early operating data to be used to identify sections requiring possible expansion to achieve an ultimate throughput of 3000 tonnes per day.Commissioning of the highly instrumented milling complex which includes crushing, grinding, cyanidation, and carbon in pulp processes commenced in February 1985. After water testing various sub-circuits from grinding through tailings, waste ore was introduced to ensure proper mechanical and electrical operation of process equipment.The first ore was milled as a mixture with waste on March 4, 1985. The first gold bullion was poured April 6, 1985.Initially, ore was only available from mine development at a rate of 700 t/d, which was milled at a minimum rate of 1200 t/d. While regular weekly shut downs of two to three days was useful for mechanical maintenance, changes, and modifications, process tuning was more difficult due to the non-steady operation. As increased quantities of ore became available, regular weekly shutdowns tapered off and process operation improved accordingly. For testing purposes and as ore was available, mill throughput was increased regularly to 2300 t/d and for very short periods of time to nearly 3000 t/d.No major design or operating problem has been encountered to date. The following is a brief description of the milling process and various operating highlights. Process flowsheets are shown in Figures 1 through 6."
Citation
APA:
(1986) Golden Giant Mine Mill Process Description and Operating HighlightsMLA: Golden Giant Mine Mill Process Description and Operating Highlights. Canadian Institute of Mining, Metallurgy and Petroleum, 1986.