Grinding Circuit Expansion At Kidston Gold Mine

Society for Mining, Metallurgy & Exploration
T. M. Needham
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
598 KB
Publication Date:
Jan 1, 1994

Abstract

Increasing ore hardness led to a gradual reduction of mill throughput rates. This, combined with declining head grades and low gold price, prompted a review of milling practice at Kidston. Plant trials and computer simulation of the grinding circuit indicated the potential to increase mill throughput by up to 451 by reducing SAG mill feed size. Secondary crushing and additional ball milling capacity were installed. Commissioning was carried out successfully in September/October 1992. Design, operation and problems of the expanded circuit are discussed, and recent operating results are presented.
Citation

APA: T. M. Needham  (1994)  Grinding Circuit Expansion At Kidston Gold Mine

MLA: T. M. Needham Grinding Circuit Expansion At Kidston Gold Mine. Society for Mining, Metallurgy & Exploration, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account