Grinding Cycle Optimization For Processing Of Copper Slag At Aurubis Bulgaria

- Organization:
- International Mineral Processing Congress
- Pages:
- 8
- File Size:
- 534 KB
- Publication Date:
- Sep 1, 2012
Abstract
In Copper smelter Aurubis Bulgaria, the copper in slag from the Flash furnace and the Converters is recovered by flotation. The scheme of slag processing is crushing, two stage grinding (autogenous and ball) and flotation. Till 2010 the grinding cycle in the plant was in two stages ? the first stage was AG Mill 70?23 working with a classifier and the second stage was ball mill 3.6/5.5 working with a hydrocyclone. In 2010 a new AG Mill 65x78 with hydrocyclone was put in operation in order to increase throughput of the plant. The second stage of the grinding cycle is with the same ball mill. The Old AG mill processed 55-60 t/h slag with particle size -0.071 mm 75% or over 75 t/h with particle size -0.071 mm 35-40 %. The new AG Mill was designed for throughput 105 t/h with particle size -0.071 mm over 70 %. After the start up there were some problems with the equipment ? block up of AG Mill?s grate and pumps for feeding of the hydrocyclone. For optimization of the process a lot of general tests were made. One of the main problem was a wearing of the sand nozzles. Different materials (rubber, ceramic, metallic) for the sand nozzles were tested. The openings of the grate were changed. This paper presents: ? the optimal technological parameters of the old and the new working scheme; ? how the technological parameters of the new working scheme change when the hydrocyclone works with different nozzles; ? the effect of the change of the grate openings; ? the problems with the increase of the circulating load; ? a final decisions for improvement of the grinding cycle work. Keywords: spigot, wearing, classification, effectiveness, circulating load, autogenous, mill
Citation
APA:
(2012) Grinding Cycle Optimization For Processing Of Copper Slag At Aurubis BulgariaMLA: Grinding Cycle Optimization For Processing Of Copper Slag At Aurubis Bulgaria. International Mineral Processing Congress, 2012.