Ground Treatment for Tunnel Construction of Line 10 Extension to the Madrid Metro Under Difficult Ground Water Conditions

Society for Mining, Metallurgy & Exploration
Manuel Arnáiz Carlos S. Oteo Manuel Herrera Rogelio Baudot Pedro R. Sola
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
6
File Size:
1358 KB
Publication Date:
Jan 1, 2003

Abstract

The aim of this paper is to describe and analyze the ground treatment performed between January and May 2002 in order to increase safety during excavation and reduce instability problems along 180 m of tunnel, during the construction works associated with line 10 extension to the Madrid Metro. The tunnel was excavated using the traditional Madrid Method and in the section considered in this paper layers of sand were detected around the tunnel crown area with a significant presence of water, the in?ow of which needed to be controlled with a minimum impact on the surrounding environment.
Citation

APA: Manuel Arnáiz Carlos S. Oteo Manuel Herrera Rogelio Baudot Pedro R. Sola  (2003)  Ground Treatment for Tunnel Construction of Line 10 Extension to the Madrid Metro Under Difficult Ground Water Conditions

MLA: Manuel Arnáiz Carlos S. Oteo Manuel Herrera Rogelio Baudot Pedro R. Sola Ground Treatment for Tunnel Construction of Line 10 Extension to the Madrid Metro Under Difficult Ground Water Conditions. Society for Mining, Metallurgy & Exploration, 2003.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account