Groundwater Control for the Toronto Subway Sheppard Line Twin Tunnels

Society for Mining, Metallurgy & Exploration
James C. Miles Harry C. Oussoren
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
293 KB
Publication Date:
Jan 1, 1999

Abstract

A new seven kilometer long subway line is being constructed through dense glacial soils under a major thoroughfare in Toronto. Eductor, deep well and vacuum wellpoint systems are being used to lower the water levels by as much as 16 metres for the construction of the twin tunnels and associated structures. The design and performance of the dewatering systems will be described. Unanticipated difficulties and their solution will be presented.
Citation

APA: James C. Miles Harry C. Oussoren  (1999)  Groundwater Control for the Toronto Subway Sheppard Line Twin Tunnels

MLA: James C. Miles Harry C. Oussoren Groundwater Control for the Toronto Subway Sheppard Line Twin Tunnels. Society for Mining, Metallurgy & Exploration, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account