Grouting For Groundwater Control Milwaukee Inline Project

Society for Mining, Metallurgy & Exploration
Richard F. Coon Edwin F. Shorey Steven B. Fradkin
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
18
File Size:
1070 KB
Publication Date:
Jan 1, 1987

Abstract

Crosstown Interceptor Phase IA is the first deep tunnel element of the Milwaukee Inline Project. The tunnel contract includes 6,492 meters (m) of 9.1-m-diameter tunnel, two access shafts, and partial lining for structural purposes. The work also includes grouting to be performed as directed by the engineer to provide groundwater infiltration control in lined and unlined reaches of the tunnel. This paper summarizes infiltration observations, progress of the grouting work, and its potential application to the remainder of the Milwaukee project.
Citation

APA: Richard F. Coon Edwin F. Shorey Steven B. Fradkin  (1987)  Grouting For Groundwater Control Milwaukee Inline Project

MLA: Richard F. Coon Edwin F. Shorey Steven B. Fradkin Grouting For Groundwater Control Milwaukee Inline Project. Society for Mining, Metallurgy & Exploration, 1987.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account