Grouting For Groundwater Control Milwaukee Inline Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 18
- File Size:
- 1070 KB
- Publication Date:
- Jan 1, 1987
Abstract
Crosstown Interceptor Phase IA is the first deep tunnel element of the Milwaukee Inline Project. The tunnel contract includes 6,492 meters (m) of 9.1-m-diameter tunnel, two access shafts, and partial lining for structural purposes. The work also includes grouting to be performed as directed by the engineer to provide groundwater infiltration control in lined and unlined reaches of the tunnel. This paper summarizes infiltration observations, progress of the grouting work, and its potential application to the remainder of the Milwaukee project.