Heap Leach Construction Over Tailings Slimes

Society for Mining, Metallurgy & Exploration
William J. Attwooll
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
6
File Size:
337 KB
Publication Date:
Jan 1, 1987

Abstract

The development of gold heap leach projects in the Cripple Creek, Colorado, mining district has required utilization of heap leach pad sites other than relatively level natural ground. This paper describes the construction of a heap leach pad adequate to accommodate 907,000 tonnes (1,000,000 st) of ore over the surface of a tailings pond constructed during previous milling activities at the site. Based on the design parameters and the observed behavior to date, it has been found feasible to construct a major heap leach pile on the surface of a conventional tailings pond.
Citation

APA: William J. Attwooll  (1987)  Heap Leach Construction Over Tailings Slimes

MLA: William J. Attwooll Heap Leach Construction Over Tailings Slimes. Society for Mining, Metallurgy & Exploration, 1987.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account