Heap Leach Gold Production Modeling

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 419 KB
- Publication Date:
- Jan 1, 2001
Abstract
Accurate prediction of gold (or other metal) production from a heap leach operation is essential to the economic vitality of any such operation. However, this is also one of the most challenging issues facing managers of these facilities. Three approaches to modeling gold production from the Valley Leach Facility (VLF) at Anglogold’s Cripple Creek & Victor Gold Mining Company are presented. Evolution of these modeling methods has been necessary as ore heights and volumes have increased. In addition, the complex geometry of the VLF presents additional complications to production modeling, Comparison of actual and predicted gold production are presented
Citation
APA:
(2001) Heap Leach Gold Production ModelingMLA: Heap Leach Gold Production Modeling. Society for Mining, Metallurgy & Exploration, 2001.