Heap Leaching Practices At Gold Fields' Mesquite Operation

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 673 KB
- Publication Date:
- Jan 1, 1987
Abstract
Gold Fields' Mesquite mine, located in southeastern California, heap leaches low grade gold ore at an annual rate of 2.7 Mt (3 million st). Ore is crushed in a two stage open circuit and belt agglomerated prior to loading on the leach pads. Since initial heap construction in October of 1985, a number of operating practices have been modified and several agglomeration techniques have been tested in an effort to improve percolation and reduce leaching time. Findings to date are discussed.
Citation
APA:
(1987) Heap Leaching Practices At Gold Fields' Mesquite OperationMLA: Heap Leaching Practices At Gold Fields' Mesquite Operation. Society for Mining, Metallurgy & Exploration, 1987.