High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case History

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 95 KB
- Publication Date:
- Jan 1, 1997
Abstract
This paper discusses the Queens Water Tunnel, No. 3, Stage 2, being driven by a new Robbins High Performance (HP) Tunnel Boring Machine (TBM).The paper is divided into four sections. In the INTRODUCTION section, a short overview of the scope of the project is presented. In the GEOLOGY section, the geological condition along the tunnel drive is briefly introduced. The TBM DESIGN section discusses the various design criteria and the resulting machine specifications. The paper concludes, in the TBM OPERATION section, with a case history describing the tunneling operation from start-up to the time of the writing of this paper.
Citation
APA:
(1997) High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case HistoryMLA: High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case History. Society for Mining, Metallurgy & Exploration, 1997.