Honeymoon Uranium Project, South Australia

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 7
- File Size:
- 516 KB
- Publication Date:
- May 1, 2006
Abstract
Long touted as Australia?s fourth uranium mine the sediment-hosted Honeymoon Uranium Project is close to commercial production using insitu-leach mining methods. Uranium mineralisation occurs as pitchblende coatings on unconsolidated quartz sand and gravels within a stacked aquifer system in a buried palaeochannel located in the Curnamona Region of South Australia. A final NI43-101 Feasibility Study is close to completion which has included extensive delineation drilling using PFN technology to accurately measure uranium grade and distribution. This data integrated with a detailed 3D sedimentalogical model is being used to optimise wellfield and plant design.
Citation
APA:
(2006) Honeymoon Uranium Project, South AustraliaMLA: Honeymoon Uranium Project, South Australia. Canadian Institute of Mining, Metallurgy and Petroleum, 2006.