Paul Y. – SELI Joint Venture had been contracted to build the longest section of the Strategic Sewage Disposal Scheme (SSDS) – Stage I. This involved two tunnels under urban and marine areas excavated by high performance hard rock open type TBMs operated from deep shafts. A specific ground treatment program was developed using advance probing and grouting to control water inflow into the excavations. The article describes: the technologies adopted, the experienced problems, the encountered productions and their interrelation with the water inflow amounts, the possible improvement in the technologies for the excavation of the future stages of the same project as well of any other project under similar conditions.
Citation
APA:
(2001) Hong Kong Strategic Sewage Disposal Scheme (SSDS) TBM Tunnelling Beneath Seabed and Urbanised Areas\MLA: Hong Kong Strategic Sewage Disposal Scheme (SSDS) TBM Tunnelling Beneath Seabed and Urbanised Areas\. Society for Mining, Metallurgy & Exploration, 2001.