How To Avoid Building A Full Scale Pilot Plant By Predicting And Eliminating Solids Handling Problems (618f278c-f937-4352-bac2-c83092193a2d)

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 8
- File Size:
- 774 KB
- Publication Date:
- Jan 1, 1988
Abstract
Many solids processes that look feasible on paper or even in pilot studies become disasters in full scale. Changes in solids flow characteristics from pilot scale to full scale because of larger so lids contact pressures, thermal shocks or unforeseen temperature excursions often cause full scale solids flow problems not encountered in the laboratory or pilot studies. Fortunately, proper applications of solids flow principals and solids flow property measurement at full scale conditions can anticipate the problems and thus provide an accurate basis for full scale design or existing plant modifications.
Citation
APA:
(1988) How To Avoid Building A Full Scale Pilot Plant By Predicting And Eliminating Solids Handling Problems (618f278c-f937-4352-bac2-c83092193a2d)MLA: How To Avoid Building A Full Scale Pilot Plant By Predicting And Eliminating Solids Handling Problems (618f278c-f937-4352-bac2-c83092193a2d). Society for Mining, Metallurgy & Exploration, 1988.