Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remainder. Piles were driven to specified tip elevations or the elevations directed by the Project Manager. In an attempt to address what installation technique(s) performed the best, several methods were used, including varied predrilled depths, open ended piles, closed ended piles, and the use of both impact and vibratory hammers. Piles were driven closed ended where possible to study the feasibility of this option to reduce construction costs associated with pile cleanout. Piles were driven to different depths to measure capacity variations. The 24-inch (610 mm) diameter piling were driven in one piece while the 42-inch (1.07 m) diameter piling was driven in two segments. A total of 79 piles were driven for the four sites, 74 of the 24-inch (610 mm) diameter and 5 of the 42-inch (1.07 m) diameter. Various hammers were used to determine which hammers provided viable solutions to the potential problems anticipated in the design phase. Hammer selection was based on the driveability studies. Equipment included a 175 ton (1.56 MN) crane, support crane for pile stabilization, crane mounted auger drill, offshore leads, Delmag D30-32, D46-32, and D62-22 diesel hammers, an HPSI 2005 single acting hydraulic hammer, a Foster IHC S-90 double acting hydraulic hammer and a Kencho VM2-25000AII vibratory hammer with the weights set to produce 17,500 pound-inch (1.98 kN-m) of eccentric moment.
Citation
APA:
(1996) I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field WorkMLA: I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work. Deep Foundations Institute, 1996.