IC 6851 Mining Methods And Costs At The Eureka Standard Mine ? Introduction

The National Institute for Occupational Safety and Health (NIOSH)
E. D. Gardner
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
17
File Size:
6596 KB
Publication Date:
Jan 1, 1935

Abstract

The mine of the Eureka Standard Consolidated dining Co. is at Dividend, Utah, in the Tintic mining district. It is operated under the same management and controlled by the Antic Standard Mining Co.; the two properties adjoin each other. The Eureka Standard is worked through a vertical shaft; the ore is mined by a stringer-set-and-fill method. One hundred and thirty men were employed in April 1933. The normal daily tonnage is 100 tons; the ore is shipped to the smelter at Garfield, Utah.
Citation

APA: E. D. Gardner  (1935)  IC 6851 Mining Methods And Costs At The Eureka Standard Mine ? Introduction

MLA: E. D. Gardner IC 6851 Mining Methods And Costs At The Eureka Standard Mine ? Introduction. The National Institute for Occupational Safety and Health (NIOSH), 1935.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account