IC 7539 Mining Methods and Practices at the Iron King Mine, Shattuk Denn Mining Corp., Yavapai County, Ariz

- Organization:
- The National Institute for Occupational Safety and Health (NIOSH)
- Pages:
- 27
- File Size:
- 40815 KB
- Publication Date:
- Jan 1, 1950
Abstract
This paper describes mining operations at the Iron King mine of the
Shattuck -Denn Mining Corp. in Yavapai County , Ariz . It is one of a series
being prepared by the Mining Division of the Bureau of Mines on mining
practices and methods in various mining districts of the United States .
The mine and surface plant of the Iron King mine are situated in
secs . 15 and 21 , T. 13 N. , R. 1 E. , about 20 miles by State highway 69 east by southeast from the city of Prescott and 1 mile southwest of the mining
town of Humboldt on the Prescott -Mayer branch of the Atchison , Topeka &
Santa Fe Railroad (fig . 1 ) . A l-mile truck haul brings the mill concentrates
(lead and zinc ) to bins on a siding of this line at Humboldt ; the silver -gold
bullion is handled separately .
Some of the oldest residents in the vicinity of Prescott claim that
the original location for the Iron King mine was made in 1880. The earliest
recorded production was in 1906-1907 . During the first World War the mine
produced fluxing ore for the Humboldt smelter .
In 1936 the property was purchased under tax sale , and a mill
(140-ton capacity ) was erected in 1938. The capacity of this mill was
increased to 225 tons the following year , and a cyanide plant was added in
1940 to treat mill tailings .
In 1942 the Shattuck -Denn Mining Corp. purchased the property . A
new working shaft was sunk , mine development was speeded , and mill capacity
was again increased .
The predominating locally formation of this district is a pre -Cambrian schist known as Yavapai schist . The Iron King deposit , which carries gold,
silver , lead , zinc , and copper , occurs as a series of lenses in a sheared
zone of the pre -Cambrian schist .
Down to the 600 -foot level the ore was mined and drawn by the shrinkage
method . The cut -and -fill method was adopted for the lower levels . Waste
rock for stope fill was provided by block-caving an area on the 600 level .
Main haulage drifts were driven in the firm footwall , and crosscuts
were driven across the mineralized zone at 100 -foot intervals .
Grab samples taken from each car of every working place and channel
samples cut every 5 feet in development work are considered sufficient for estimating ore reserves .
Citation
APA:
(1950) IC 7539 Mining Methods and Practices at the Iron King Mine, Shattuk Denn Mining Corp., Yavapai County, ArizMLA: IC 7539 Mining Methods and Practices at the Iron King Mine, Shattuk Denn Mining Corp., Yavapai County, Ariz. The National Institute for Occupational Safety and Health (NIOSH), 1950.