IC 7858 Using Precast Reinforced-Concrete Sets In The Pioneer Tunnel Of Great Northern Railway's Cascade Tunnel, King County, Wash. ? Summary And Introduction

The National Institute for Occupational Safety and Health (NIOSH)
E. W. Parsons
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
14
File Size:
4410 KB
Publication Date:
Jan 1, 1958

Abstract

Permanent support of the back is an important economic factor in maintaining a tunnel or other underground opening in condition to render the service for which it was driven. Timber has been most commonly used for support in tunneling and drifting because of its strength and ease of installation. Even when treated for decay, however, timber is subject to deterioration and, over a long period of time, should not be considered a permanent support. Concrete support or lining is permanent and has been used in tunnels of every size for many years but has been almost exclusively cast in place, a difficult, costly process. This report deals with the design and installation of precast concrete supports to combine the best features of both methods.
Citation

APA: E. W. Parsons  (1958)  IC 7858 Using Precast Reinforced-Concrete Sets In The Pioneer Tunnel Of Great Northern Railway's Cascade Tunnel, King County, Wash. ? Summary And Introduction

MLA: E. W. Parsons IC 7858 Using Precast Reinforced-Concrete Sets In The Pioneer Tunnel Of Great Northern Railway's Cascade Tunnel, King County, Wash. ? Summary And Introduction. The National Institute for Occupational Safety and Health (NIOSH), 1958.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account