Impacts Of The No- Blasting Specification On The Deep Tunnel Project Chicago, IL

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 5
- File Size:
- 329 KB
- Publication Date:
- Jan 1, 1993
Abstract
In 1988, the Metropolitan Water Reclamation District of Greater Chicago (MWRD) imposed a no-blasting specification (blasting is restricted to the construction shaft and shaft bottom or boot) on the Deep Tunnel project. This was prompted by numerous complaints from residents in the vicinity of the project and controversies experienced on previous projects from blasting the rock overlying the tunnel. This paper will describe the methods used by two major contractors driving 20 km (12.5 miles) of tunnel, and drilling more than 36 shafts under this restrictive specification. The impacts are detailed on design, construction, schedule, cost and the environment.
Citation
APA:
(1993) Impacts Of The No- Blasting Specification On The Deep Tunnel Project Chicago, ILMLA: Impacts Of The No- Blasting Specification On The Deep Tunnel Project Chicago, IL. Society for Mining, Metallurgy & Exploration, 1993.