Impacts Of The No-Blasting Specification On The Deep Tunnel Project, Chicago, Illinois

Society for Mining, Metallurgy & Exploration
V. Rajaram
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
8
File Size:
468 KB
Publication Date:
Jan 1, 1991

Abstract

The Metropolitan Water Reclamation District of Greater Chicago (MWRD) imposed a no-blasting specification (blasting is restricted to the construction shaft and shaft bottom or boot) on the Deep Tunnel project in 1988. This was prompted by numerous complaints from the residents in the vicinity of the project, and controversies experienced on previous projects from blasting the rock overlying the tunnel. This paper will describe the methods utilized by two major contractors who are driving 20 km (12.5 of tunnel along with drilling over 36 shafts under this restrictive specification. The impacts on design, construction, schedule, cost, and the environment are detailed.
Citation

APA: V. Rajaram  (1991)  Impacts Of The No-Blasting Specification On The Deep Tunnel Project, Chicago, Illinois

MLA: V. Rajaram Impacts Of The No-Blasting Specification On The Deep Tunnel Project, Chicago, Illinois. Society for Mining, Metallurgy & Exploration, 1991.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account