Implementation of Pastefill at the Barrick Goldstrike Mine

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 5
- File Size:
- 234 KB
- Publication Date:
- Jan 1, 2015
Abstract
"INTRODUCTION The paste plant is located at the Barrick Goldstrike mine in Northern Nevada on the Carlin Trend. The Goldstrike property consists of an open pit and an underground mine; along with two processing facilities: a roaster and an autoclave. The underground portion of the mine produces approximately 1,800,000 ore tons per year and approximately 400,000 ounces. The mine is broken up into four distinct zones: Banshee, Meikle, Rodeo and Northpost. The current paste plant services both the Rodeo and Northpost zones. Development of the conceptual designs and permit approval for this plant was an extensive process that took over a decade to complete. A testing program was developed in conjunction with this process and implemented throughout to ensure the following metrics were achieved: ensure no environmental impact, material available onsite would be able to flow through the pipe to all required locations, and that this material could achieve the appropriate final strength. PLANT AND UNDERGROUND CONSTRUCTION This is the first paste plant to be built in Nevada. The paste plant at Goldstrike began construction in January 2012 and was completed in March of 2013. This plant was constructed to service the Rodeo side of the underground mine which previously utilized a cemented rock fill (CFR) plant to meet their backfill needs. However, in March of 2013, the same month the plant was commissioned, the raise that fed this CRF plant was mined out in a planned phase of the adjacent open pit. This made the switch to paste all the more difficult as it was being relied on for as the sole source of backfill production even though the system yet to be fully tested and optimized. The plant was designed to be fed with onsite Roaster tailing which would be thickened and then mixed with cement and fly ash. The plant was designed to pump 177 tons of paste per hour with a utilization of 65%. The original design specifications for the paste were 77% solids with varying binder contents depending on where the paste was being placed"
Citation
APA:
(2015) Implementation of Pastefill at the Barrick Goldstrike MineMLA: Implementation of Pastefill at the Barrick Goldstrike Mine. Society for Mining, Metallurgy & Exploration, 2015.