Importance Of Multiple Stress Measurements In Design Balsam Meadow Hydroelectric Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 17
- File Size:
- 751 KB
- Publication Date:
- Jan 1, 1987
Abstract
INTRODUCTION The Balsam Meadow Project, presently under construction for the Southern California Edison Company, is located approximately 55 miles northeast of Fresno, in the Sierra Nevada Mountains (Fig. 1). Major components of this project include an underground powerhouse for a 200 MW unit and a high pressure power tunnel/shaft. Site exploration [ ]
Citation
APA:
(1987) Importance Of Multiple Stress Measurements In Design Balsam Meadow Hydroelectric ProjectMLA: Importance Of Multiple Stress Measurements In Design Balsam Meadow Hydroelectric Project. Society for Mining, Metallurgy & Exploration, 1987.