In-Situ Leaching Wellfield Design At San Manuel (6664c3e1-7b01-45f7-9059-ffbafdfcdaaf)

Society for Mining, Metallurgy & Exploration
K. L. Wiley
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
5
File Size:
407 KB
Publication Date:
Jan 1, 1993

Abstract

In-situ leaching, initiated in 1986 at San manual, was economically developed in 1989. The primary reason for this lag time between startup and viable production was the time required for technical development. The technical development pursued comprised detailed design, development, and implementation of in-situ well construction methods, formulation of suitable well pattern arrays, and the development of extensive hydrogeologic and geochemical knowledge of the mineral deposit. Since 1989, the in-situ leaching program has become a viable and cost effective method to extract copper from the supergene mineralized zone of the San Manuel deposit. The in-situ leaching methods that are currently utilized have been progressively expanded and continually developed and will became the cornerstone of copper production from the San Manuel oxide mineral deposit. This paper presents an overview of the supergene hydrogeology, current design techniques, drilling methods and well completion, pump determination and setting, solution management, and future plans for the increased extraction of copper by in-situ leaching methods at the San Manuel mine.
Citation

APA: K. L. Wiley  (1993)  In-Situ Leaching Wellfield Design At San Manuel (6664c3e1-7b01-45f7-9059-ffbafdfcdaaf)

MLA: K. L. Wiley In-Situ Leaching Wellfield Design At San Manuel (6664c3e1-7b01-45f7-9059-ffbafdfcdaaf). Society for Mining, Metallurgy & Exploration, 1993.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account