Increased Ore Grindability And Plant Through-Put With Controlled Blasting

Society for Mining, Metallurgy & Exploration
M. C. Fuerstenau G. Chi R. C. Bradt A. Ghosh
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
6
File Size:
329 KB
Publication Date:
Jan 1, 1998

Abstract

With increased emphasis on controlled blasting, which is the first and least-costly stage of comminution, ore grindability and plant throughput can be increased by 5% to 10%, and energy savings of up to 10% appear possible. Crushing and grinding efficiencies are presented for ore blasted under regular and adjusted field conditions. An economic analysis of drilling and blasting through crushing and grinding is presented, suggesting that cost savings approaching 10% may be achieved.
Citation

APA: M. C. Fuerstenau G. Chi R. C. Bradt A. Ghosh  (1998)  Increased Ore Grindability And Plant Through-Put With Controlled Blasting

MLA: M. C. Fuerstenau G. Chi R. C. Bradt A. Ghosh Increased Ore Grindability And Plant Through-Put With Controlled Blasting. Society for Mining, Metallurgy & Exploration, 1998.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account