Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS

Society for Mining, Metallurgy & Exploration
Poltak Sinaga
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
1161 KB
Publication Date:
Jan 1, 2008

Abstract

PT Kaltim Prima Coal?s 13.1 km overland conveyor (OLC) was commissioned in 1991. It is of conventional 3 roller 350 trough belt type. Cost and performance optimization during initial design ended up with 5.4 mps belt speed, 1000 mm belt width to convey 1350tph, and 7 mtpa of coal. Despite high initial figure, the belt speed was lifted to 6.5 mps in 1996 to accommodate mine throughput increase. In 2002, new low loss ST2100 1100mm wide belt replaced the old ST2250 due for change-out. An upgrade project was initiated at the end of 2003 to further increase the belt speed to 8.5 mps, hence to increase the OLC capacity to 30 mtpa (million ton per annum). Performance data, experience of site personnel, site observation and tests, benchmarking, and information from equipment manufacturers were major inputs to the design review. The project fast track was another challenge in addition to executing modifications on a production lifeline. The project was completed within fifteen months and the OLC was successfully commissioned at 8.5 mps belt speed in February 2005. The OLC has been to date conveying 4 200 tph satisfactorily.
Citation

APA: Poltak Sinaga  (2008)  Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS

MLA: Poltak Sinaga Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS. Society for Mining, Metallurgy & Exploration, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file