Innovative NATM Technology for Suburban Tunnelling Metro Section 306, Bochum, Germany

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 20
- File Size:
- 6898 KB
- Publication Date:
- Jan 1, 2005
Abstract
Bochum’s Underground Lot 306 was characterised by a confined site and unique tunnelling methods. A highly mechanized construction concept was developed to achieve high progress rates. Bespoke backup systems for muck disposal and material supply were used. For the first time in suburban tunnelling, wet shotcrete, batched onsite, was applied. A three-storey underground car park had to be undermined with only1.5 m of overburden and had to be lifted several times by “compensation grout in.” An existing operational two-lane metro tunnel was enlarged without any major impact on train operation.
Citation
APA:
(2005) Innovative NATM Technology for Suburban Tunnelling Metro Section 306, Bochum, GermanyMLA: Innovative NATM Technology for Suburban Tunnelling Metro Section 306, Bochum, Germany. Society for Mining, Metallurgy & Exploration, 2005.