Installation Of A 350 T Bof Converter At Arcelormittal Poland

Associacao Brasileira de Metalurgia,  Materiais e Mineracao
Günther Staudinger
Organization:
Associacao Brasileira de Metalurgia, Materiais e Mineracao
Pages:
11
File Size:
1626 KB
Publication Date:
Jul 29, 2018

Abstract

Danieli Linz Technology has been honored at 4.1.2013 with the first contract for the exchange of a 350 t BOF converter for ArcelorMittal Poland Dabrowa Gornicza on a turnkey basis. This paper describes the new design features of this converter based on the development of a new Danieli converter suspension system. The issue was to install a new converter (incl. trunnion ring, suspension system and bearings) with maximum volume but keeping most of the existing equipment unchanged. So, the big tilting drives on both sides had to be reused and the existing foundation, pedestals as well as the bearing distance had to be maintained. Further on the welded coreequipment (vessel shell, trunnion ring, pedestals, slag shields, etc.) was manufactured in-house within the pressure vessel division of Danieli Thailand. Due to the huge dimensions of these parts the delivery had to take place in parts which had to be welded together on site under full production conditions of the steel plant. But also the erection had to be applied under this condition. Additionally the main support bearings, parts of the screening (doghouse) as well as an upgrade of the existing relining machine had to be delivered.
Citation

APA: Günther Staudinger  (2018)  Installation Of A 350 T Bof Converter At Arcelormittal Poland

MLA: Günther Staudinger Installation Of A 350 T Bof Converter At Arcelormittal Poland. Associacao Brasileira de Metalurgia, Materiais e Mineracao, 2018.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account