Abstract
The Southern Peru Copper Corp. (SPCC) recently built an integrated copper project consisting of dump- and heap-leaching operations at its mine complex in Peru.  The pregnant leach solution (PLS) containing the solubilized copper from the leaching operations is processed in a new solvent extraction/electrowinning (SX/EW) facility to produce high-purity cathode copper.     The dump leaching and SX/EW facilities are located near the Toquepala mine site.  The crushing and heap-leaching operation is located at the Cuajone Mine.  The pregnant leach solution from Toquepala and Cuajone is pumped 35 km (22 miles) to the SX/EW plant at Toquepala.     The SX/EW plant consists of three trains of solvent extraction (SX), a tank farm area and an electrowinning (EW) facility.  The solvent extraction plant has a total PLS flow capacity of 3,210 m3/hr (113,360 cu ft/hr).  The electrowinning facility has an expected long-term production capacity of 97 t/d(107 stpd) or about 35 kt/a (38,500 stpy) of cathode copper.  However, present production exceeds the expected long-term by about 20%.
Citation
APA: (1996) Integrating the Toquepala and Cuajone SX/EW Operations
MLA: Integrating the Toquepala and Cuajone SX/EW Operations. Society for Mining, Metallurgy & Exploration, 1996.