Iron and Steel Division - Equilibrium Between Blast-Furnace Metal and Slag as Determined by Remelting

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 5
- File Size:
- 434 KB
- Publication Date:
- Jan 1, 1953
Abstract
ONE of the primary purposes of this investigation was to determine how far blast-furnace metal and slag depart from equilibrium, particularly with respect to sulphur distribution. In studying the equilibrium between blast-furnace metal and slag, there are two approaches that can be used. One method is to use synthetic slags, as was done by Hatch and Chipman;' the other is to equilibrate the metal and slag from the blast furnace by remelting in the laboratory. In the set of experiments here reported, metal and slag tapped simultaneously from the same blast furnace were used for all the runs. The experiments were divided into two groups: 1—a time series at each of three different temperatures to determine the t.ime required for metal and slag to equilibrate in various respects under the experimental conditions of remelting, and 2—an addition series to determine the effect of additions to the slag on the equilibrium between the metal and slag. An atmosphere of carbon monoxide was used to simulate blastfurnace conditions. The furnace used for this investigation was a vertically mounted tubular Globar type with two concentric porcelain tubes inside the heating element. The control couple was located between the two porcelain tubes. The carbon monoxide atmosphere was introduced through a mercury seal at the bottom of the inner tube. On top, a glass head (with ground joint) provided access for samples and a long outlet tube prevented air from sucking back into the furnace. The charge used was iron 6 g, slag 5 g for the time series, or iron 9 g, slag 7 % g for the addition series. This slag-to-metal ratio of 0.83 approximates the average for blast-furnace practice, which commonly ranges from about 0.6 to 1.1. A crucible of AUC graphite containing the above charge was suspended by a molybdenum wire in the head and, after flush, was lowered to the center of the furnace as shown in Fig. 1. The cylindrical crucible was 2 in. long x % in. OD. The furnace was held within &3"C of the desired temperature for all the runs. The temperature was checked after the end of each run by flushing the inner tube with air and placing a platinum-platinum-10 pct rhodium thermocouple in the position previously occupied by the crucible; the temperature of the majority of the runs was much closer than the deviation specified above. The couple was checked against a standard couple which had been calibrated at the gold and palladium points, and against a Bureau of Standards couple. The carbon monoxide atmosphere was prepared by passing COz over granular graphite at about 1200°C. It was purified by bubbling through a 30 pct aqueous solution of potassium hydroxide and passing through ascarite and phosphorus pentoxide. The train and connections were all glass except for a few butt joints where rubber tubing was used for flexibility. The rate of gas flow was 25 to 40 cc per min. As atmospheric pressure prevailed in the furnace, the pressure of carbon monoxide was only slightly higher than the partial pressure thereof in the bosh and hearth zones of a blast furnace—by virtue of the elevated total pressure therein. Simultaneous samples of blast-furnace metal and slag were taken for these remelting experiments. The composition of each is given in the first line of Table I. There is considerable uncertainty as to the significant temperature in a blast furnace at which to compare experimental results. This uncertainty arises not only from lack of temperature measurements in the furnace, but also from lack of knowledge of the zone where the slag-metal reactions occur. (Do they occur principally at the slag-metal interface in the crucible, or as the metal is descending through the slag, or even higher as slag and metal are splashing over the coke?) The known temperatures are those of the metal at cast, which averages about 2600°F, and of the cast or flush slag, which is usually about 100°F hotter. To bridge this uncertainty, remelting temperatures were chosen as 1400°, 1500" (2732°F), and 1600°C. For the time series the duration of remelt was 1, 2, 4, 8, 17, or 66 hr; crucible and contents were quenched in brine. The addition series were quenched by rapidly transferring the crucible and contents from the furnace to a close-fitting copper "mold." Of incidental interest here is the fact that the slag wet the crucible
Citation
APA:
(1953) Iron and Steel Division - Equilibrium Between Blast-Furnace Metal and Slag as Determined by RemeltingMLA: Iron and Steel Division - Equilibrium Between Blast-Furnace Metal and Slag as Determined by Remelting. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1953.