Jet Grout Ground Modifications for the Brightwater Conveyance System

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 5
- File Size:
- 226 KB
- Publication Date:
- Jan 1, 2008
Abstract
Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till, to assist with both hand-mined and TBM tunneling operations at vertical access shafts. The ground modification program was completed with a modified double fluid jet grouting system to construct continuous overlapping soilcrete columns to depths up to 94-ft below existing grade. This paper presents the sequence and methodology for the ground modification work and capabilities of jet grouting for structural support and groundwater control in the challenging soil profile present at the Brightwater Conveyance System Project.
Citation
APA:
(2008) Jet Grout Ground Modifications for the Brightwater Conveyance SystemMLA: Jet Grout Ground Modifications for the Brightwater Conveyance System. Society for Mining, Metallurgy & Exploration, 2008.