Jet Grout Ground Modifications for the Brightwater Conveyance System

Society for Mining, Metallurgy & Exploration
Richard Hanke
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
5
File Size:
226 KB
Publication Date:
Jan 1, 2008

Abstract

Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till, to assist with both hand-mined and TBM tunneling operations at vertical access shafts. The ground modification program was completed with a modified double fluid jet grouting system to construct continuous overlapping soilcrete columns to depths up to 94-ft below existing grade. This paper presents the sequence and methodology for the ground modification work and capabilities of jet grouting for structural support and groundwater control in the challenging soil profile present at the Brightwater Conveyance System Project.
Citation

APA: Richard Hanke  (2008)  Jet Grout Ground Modifications for the Brightwater Conveyance System

MLA: Richard Hanke Jet Grout Ground Modifications for the Brightwater Conveyance System. Society for Mining, Metallurgy & Exploration, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account