Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction

Deep Foundations Institute
Chu E. Ho Aaron Evans Tom Richards
Organization:
Deep Foundations Institute
Pages:
10
File Size:
1284 KB
Publication Date:
Jan 1, 2016

Abstract

"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet grouting layout was complicated by the presence of a left-in-place bulkhead of unknown dimensions abandoned by previous construction of the existing tunnel. Jet grouting was performed through predrilled holes within the narrow space between the existing bulkhead sheeting and tunnel structure. A systematic sequence of primary and secondary jet grout elements of varying diameters and panel lengths was executed to achieve an effective groundwater barrier. A key challenge in the jet grout design was the impact of potential deviations due to shadowing effects of the left-in-place bulkhead sheeting and pre-formed jet grout columns, as well as overbreak concrete in adjacent secant pile walls. The flexibility of the jet grouting methodology enabled a wide range of operational parameter combinations to be performed, allowing column diameters to be adjusted based on actual field installation measurements. Special precaution was exercised when grouting at critical locations to avoid over-pressurization and damage to the existing tunnel structure.IntroductionThe 96th Street Station box for the new Second Avenue Subway Line in Manhattan, New York included a transition tunnel, which connected the station to an existing tunnel built in the early 1970s (Figure 1). The new station and transition tunnel were both constructed using the cut-and-cover technique with bottom-up sequence (Aksman et al. 2012, Grigson et al. 2016). The main station structure incorporated permanent diaphragm walls for most of its length, except for the southern segment where high rock levels were encountered and the station box was constructed within temporary secant pile walls socketed into the rock. The permanent diaphragm walls were also utilized for temporary excavation support (Ho and Hu 2014). At the northern end of the site, the new transition tunnel was constructed within temporary secant pile walls that extended from the station diaphragm walls to the existing tunnel at the tie-in location. A temporary traffic deck spanning 60ft across the secant pile and diaphragm walls along the full excavated length of the site allowed traffic to continue operating at street level while construction of the station and transition tunnel progressed below grade."
Citation

APA: Chu E. Ho Aaron Evans Tom Richards  (2016)  Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction

MLA: Chu E. Ho Aaron Evans Tom Richards Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction. Deep Foundations Institute, 2016.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account