Kalgoorlie Nickel Smelter Environmental Project

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 17
- File Size:
- 1166 KB
- Publication Date:
- Jan 1, 1998
Abstract
In ,1993, the WMC Resources Ltd.-owned Kalgoorlie Nickel Smelter, underwent a capacity upgrade. This capacity increase was offset by .air quality control restrictions limiting the smelter's availability to 80%. As the direct. result of this limitation, WMC Resources Ltd commissioned a double absorption contact ,acid ,plant for the desulphurisation of furnace waste gas in August 1996. The history and the impact of the acid plant on S02 emissions and air quality is reviewed. General descriptions of the other aspects of the Kalgoorlie Nickel Smelter's Environmental Project are also included in the paper. Information on 'the design features? and operating practices that relate to or contrast with practices at operations visited by KNS personnel prior to acid plant commissioning provide the paper's focus. Smelter operation has changed markedly from unstable operation prior to 1997 to continuous" operation with little down time due to mechanical or process failures resulting in increased smelter availability to more than 90%
Citation
APA:
(1998) Kalgoorlie Nickel Smelter Environmental ProjectMLA: Kalgoorlie Nickel Smelter Environmental Project. The Minerals, Metals and Materials Society, 1998.