Kennecott Utah Copper began a modernization program in 1986 that was aimed at expanding and updating mining and ore process facilities at the company’s Bingham Canyon copper mine and concentrator near Salt Lake City, UT. Major components of the project included installation of an in-pit crusher, a transfer conveying system and a new ore concentrator with a design capacity of 70 kt/d (77,000 stpd). The Copperton concentrator was commissioned in February 1988. The grinding circuit is one of its principal features. It consists of three identical lines, each with a 10.4-m- (34-ft-) diam x 4.6-m- (15-ft-) long semiautogenous grinding (SAG) mill and two 5.5-m- (18-ft-) diam x 8.6- (28-ft-) long ball mills. The SAG mills are driven by two 4.5-MW (each) (6000-hp) variable- speed dc motors through a clutch-pinion gear-ring gear assembly. The ball mills are driven by 4.1-MW (5500-hp) synchronous motors coupled through a typical clutch-pinion gear-ring gear system.
Citation

APA: D. S. Bird  (1995)  Kennecott Adds Fourth Grinding Circuit at Copperton Concentrator

MLA: D. S. Bird Kennecott Adds Fourth Grinding Circuit at Copperton Concentrator. Society for Mining, Metallurgy & Exploration, 1995.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account