Bateman Engineering managed the establishment of a second diamond treatment plant at the Letseng Mine in the Mokhotlong District of northern Lesotho, about 100 km from the town of Buthe Buthe. Letseng Diamonds Proprietary Limited, is owned 70 % by Gem Diamonds and 30 % by the Government of the Kingdom of Lesotho. The second plant, which commenced construction in late 2006, doubled Letseng Mines' hard rock processing capacity from 2.6 million t/yr to 5.2 million t/yr, making it the worlds' seventh largest diamond mine by throughput. Bateman Engineering provided the engineering design, procurement and construction management of the new plant.
Citation
APA: (2010) Letseng Mine No. 2 Plant Project -A Process Engineering And Design Review
MLA: Letseng Mine No. 2 Plant Project -A Process Engineering And Design Review. The Southern African Institute of Mining and Metallurgy, 2010.