Letseng Mine No. 2 Plant Project -A Process Engineering And Design Review

The Southern African Institute of Mining and Metallurgy
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
14
File Size:
2520 KB
Publication Date:
Jan 1, 2010

Abstract

Bateman Engineering managed the establishment of a second diamond treatment plant at the Letseng Mine in the Mokhotlong District of northern Lesotho, about 100 km from the town of Buthe Buthe. Letseng Diamonds Proprietary Limited, is owned 70 % by Gem Diamonds and 30 % by the Government of the Kingdom of Lesotho. The second plant, which commenced construction in late 2006, doubled Letseng Mines' hard rock processing capacity from 2.6 million t/yr to 5.2 million t/yr, making it the worlds' seventh largest diamond mine by throughput. Bateman Engineering provided the engineering design, procurement and construction management of the new plant.
Citation

APA:  (2010)  Letseng Mine No. 2 Plant Project -A Process Engineering And Design Review

MLA: Letseng Mine No. 2 Plant Project -A Process Engineering And Design Review. The Southern African Institute of Mining and Metallurgy, 2010.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account