Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 270 KB
- Publication Date:
- Jan 1, 2003
Abstract
During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future variations in ore type impact on plant performance has been an integral part of LihirÆs development program. This paper discusses the key drivers for significant improvements to the plant, including a second oxygen plant, a pilot flotation plant, an autoclave heat recovery circuit, a pebble crushing circuit and additional autoclave feed pumping capacity. The result is a process plant with the flexibility to accommodate variations in ore type without significant loss of throughput.
Citation
APA: (2003) Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation
MLA: Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation. The Australasian Institute of Mining and Metallurgy, 2003.