Loading and Blasting a Hot Pillar Remnant

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 4
- File Size:
- 2898 KB
- Publication Date:
- Jan 1, 1977
Abstract
This paper deals with the practical problems as sociated with blasting a heated pillar remnant. This pillar remnant was the final stage in the blasting of a multi-stag e pillar blast. Production from the previous stages had produced burning sulphide ore, resulting in high rock temperatures in the final unblasted stage. This is an account of how, under difficult conditions, the pillar remnant was blasted.
Citation
APA:
(1977) Loading and Blasting a Hot Pillar RemnantMLA: Loading and Blasting a Hot Pillar Remnant. Canadian Institute of Mining, Metallurgy and Petroleum, 1977.