Long Rockbolt Support at New Broken Hill Consolidated Limited

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
1636 KB
Publication Date:
Jan 1, 1974

Abstract

Stope back conditions in the cut-and-fill stopes at New Broken Hill Consolidated Limited often deteriorate to such an extent that, because conventional rockbolts are not able to maintain safe working conditions, square-set timber is installed. An attempt to eliminate this costly procedure has involved the use of long grouted rockbolts using high tensile prestressing wire. These bolts were developed in conjunction with the prestressing engineers of BBR (Aust.). This form of support has improved the back conditions, maintained safe working conditions, and delayed the introduction of timber in a number of stopes.Production from these stopes has been maintained at its previous level (at a rate approximately double that of a comparable timber stope).
Citation

APA:  (1974)  Long Rockbolt Support at New Broken Hill Consolidated Limited

MLA: Long Rockbolt Support at New Broken Hill Consolidated Limited. The Australasian Institute of Mining and Metallurgy, 1974.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account