Long-Term Production Scheduling Using A Multidimensional Computerized Model

Society for Mining, Metallurgy & Exploration
F. Leschhorn
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
15
File Size:
466 KB
Publication Date:
Jan 1, 1989

Abstract

A computer model for long-term production scheduling is presented. By combination of different operations research algorithms it has been possible to design a system which is able to solve difficult long-term planning problems. The practical application of the model by a west-german hard coal mine is shown. It is proven that the EDP-model provides substantial support to the planning engineer by solving complex optimization problems.
Citation

APA: F. Leschhorn  (1989)  Long-Term Production Scheduling Using A Multidimensional Computerized Model

MLA: F. Leschhorn Long-Term Production Scheduling Using A Multidimensional Computerized Model. Society for Mining, Metallurgy & Exploration, 1989.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account