Long-Term Production Scheduling Using A Multidimensional Computerized Model

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 15
- File Size:
- 466 KB
- Publication Date:
- Jan 1, 1989
Abstract
A computer model for long-term production scheduling is presented. By combination of different operations research algorithms it has been possible to design a system which is able to solve difficult long-term planning problems. The practical application of the model by a west-german hard coal mine is shown. It is proven that the EDP-model provides substantial support to the planning engineer by solving complex optimization problems.
Citation
APA:
(1989) Long-Term Production Scheduling Using A Multidimensional Computerized ModelMLA: Long-Term Production Scheduling Using A Multidimensional Computerized Model. Society for Mining, Metallurgy & Exploration, 1989.